TUGBOAT SHERI LYNN S BREAKING ICE ON AREA WATERWAYS
1/9/2018 8:14:43 AM


Sheri Lynn S is the newest tugboat at Picton Terminal and will be breaking ice from Picton Bay to Amherst Island for the duration of winter. We spoke with Sandy Berg, Project Manager at Doornekamp Construction, and she wants those who sled or ice fish around Picton Bay, to be aware of the tugboat's route as ice conditions may become unsafe near the boat:

   
She provides details of the tugboat Sheri Lynn S:


Sheri Lynn S will breaking ice for MTO ferries at Glenora and Amherst Island to keep shipping routes navigable through the winter

WebReadyTM Powered by WireReady® NSI  |  © Copyright 2008-2011 My Broadcasting Corporation

Back to News

 
 
 
 
 
 
While using VBScript LoadPicture() function, Error calculating dimensions for: E:\www\3592\www\onlinedb\ckymfm\pics\EasternOntarioJobShop.ca_180x150.gifPath/File access error


 
 
 
 
 
 
 
 

Copyright 2012 NapaneeToday.ca. All rights reserved.

This site powered by PromoSuite Interactive